Tunisia’s installed renewable energy capacity is on a steady upwards trend. Having ended 2025 with 1.21GW installed capacity according to IRENA, 100MW has been added this year, and Norway’s Scatec plans to commission a 100MW solar photovoltaic (PV) plant in 2027. After years of financing delays and stalled plans, momentum is finally building (MEES, 3 January 2025).
A JV grouping Norway’s Scatec and Japan’s Aeolus – a subsidiary of Toyota Tsusho – is aiming to commission the 100MW (120MWp) Sidi Bouzid II solar PV plant by 2H 2027, the Norwegian developer said in its Q3 results on 30 October. (CONTINUED - 801 WORDS)