Israel’s 22.3tcf Leviathan gas field saw gas flows “reduced temporarily” on 11 November, operator US major Chevron announced.
The reduction comes amid “scheduled maintenance work” that is connected to the field’s planned expansion from 1.2bn cfd to 1.45bn cfd. It was not immediately clear how long the reduction in flows would last. (CONTINUED - 265 WORDS)